top of page

Projects

PWS 3K Series

2013

The First project I played a dual role as project manager and designer for Pfannenberg was an Air to Water cooling unit. This was another brand new line of units for Pfannenberg. This new series was a total of 8 units each having an indoor, outdoor & stainless steel application. This was definitely the largest project in terms of total number of units that were needed to be ready for production. The project was also very unique, as it was the brand new look for Pfannenberg units. A new unique front face that was going to be incorporated into all units going forward.

© 2015 by Dave Pistello, Mechanical Designer. Proudly created with Wix.com

  • White LinkedIn Icon
  • White Facebook Icon
bottom of page